| MANUFACTURE |
TYPE |
L(MM) |
W(MM) |
H(MM) |
DOOR W |
DOOR H |
Cu M |
Pay Load(KGS) |
Tare W (KGS)2% |
Gross W(KGS) |
| DCMC |
20'GP |
5,900.00 |
2,352.00 |
2,395.00 |
2,343.00 |
2,280.00 |
33.20 |
28,340.00 |
2,140.00 |
30,480.00 |
| KSCF |
20'GP |
5,897.00 |
2,352.00 |
2,393.00 |
2,343.00 |
2,280.00 |
33.20 |
28,230.00 |
2,250.00 |
30,480.00 |
| NOC |
20'GP |
5,898.00 |
2,352.00 |
2,393.00 |
2,343.00 |
2,280.00 |
33.20 |
28,280.00 |
2,200.00 |
30,480.00 |
| NTCIMC |
20'GP |
5,898.00 |
2,352.00 |
2,393.00 |
2,343.00 |
2,280.00 |
33.20 |
28,300.00 |
2,180.00 |
30,480.00 |
| QUCE |
20'GP |
5,898.00 |
2,352.00 |
2,393.00 |
2,343.00 |
2,280.00 |
33.20 |
28,190.00 |
2,290.00 |
30,480.00 |
| SFEC |
20'GP |
5,897.00 |
2,352.00 |
2,393.00 |
2,343.00 |
2,280.00 |
33.20 |
28,230.00 |
2,250.00 |
30,480.00 |
| SHHD |
20'GP |
5,898.00 |
2,350.00 |
2,392.00 |
2,341.00 |
2,280.00 |
33.20 |
28,230.00 |
2,250.00 |
30,480.00 |
| SPIC |
20'GP |
5,898.00 |
2,352.00 |
2,395.00 |
2,343.00 |
2,280.00 |
33.20 |
28,295.00 |
2,185.00 |
30,480.00 |
| SZ(XH)CIMC |
20'GP |
5,898.00 |
2,352.00 |
2,393.00 |
2,343.00 |
2,280.00 |
33.20 |
28,300.00 |
2,180.00 |
30,480.00 |
| TYC |
20'GP |
5,898.00 |
2,350.00 |
2,390.00 |
2,343.00 |
2,280.00 |
33.10 |
28,260.00 |
2,220.00 |
30,480.00 |
| XPIC |
20'GP |
5,898.00 |
2,352.00 |
2,395.00 |
2,343.00 |
2,280.00 |
33.20 |
28,295.00 |
2,185.00 |
30,480.00 |
| NTCIMC |
20'GP |
5,900.00 |
2,352.00 |
2,350.00 |
2,340.00 |
2,280.00 |
32.60 |
28,360.00 |
2,120.00 |
30,480.00 |
| SCRC |
20'GP |
5,440.00 |
2,298.00 |
2,274.00 |
2,290.00 |
2,264.00 |
28.40 |
23,800.00 |
3,120.00 |
30,480.00 |
| REEFERCO |
20'GP |
5,443.00 |
2,300.00 |
2,280.00 |
2,300.00 |
2,237.00 |
28.60 |
23,685.00 |
3,315.00 |
30,480.00 |
| SCRC |
20'RF |
5,489.00 |
2,298.00 |
2,274.00 |
2,290.00 |
2,264.00 |
28.50 |
23,970.00 |
3,030.00 |
27,000.00 |
| DCMC |
40'GP |
12,034.00 |
2,352.00 |
2,395.00 |
2,343.00 |
2,280.00 |
67.80 |
26,830.00 |
3,650.00 |
30,480.00 |
| KSCF |
40'GP |
12,034.00 |
2,352.00 |
2,393.00 |
2,343.00 |
2,280.00 |
67.70 |
26,830.00 |
3,650.00 |
30,480.00 |
| NOC |
40'GP |
12,032.00 |
2,352.00 |
2,393.00 |
2,343.00 |
2,280.00 |
67.80 |
26,740.00 |
3,740.00 |
30,480.00 |
| NTCIMC |
40'GP |
12,034.00 |
2,352.00 |
2,393.00 |
2,343.00 |
2,280.00 |
67.70 |
26,830.00 |
3,650.00 |
30,480.00 |
| QUCE |
40'GP |
12,032.00 |
2,352.00 |
2,393.00 |
2,343.00 |
2,280.00 |
67.80 |
26,855.00 |
3,625.00 |
30,480.00 |
| SFEC |
40'GP |
12,031.00 |
2,352.00 |
2,393.00 |
2,343.00 |
2,280.00 |
67.70 |
26,780.00 |
3,700.00 |
30,480.00 |
| SHHD |
40'GP |
12,032.00 |
2,350.00 |
2,392.00 |
2,341.00 |
2,280.00 |
67.60 |
26,770.00 |
3,710.00 |
30,480.00 |
| SPIC |
40'GP |
12,031.00 |
2,352.00 |
2,395.00 |
2,343.00 |
2,280.00 |
67.80 |
26,740.00 |
3,740.00 |
30,480.00 |
| SZ(XH)CIMC |
40'GP |
12,032.00 |
2,352.00 |
2,393.00 |
2,343.00 |
2,280.00 |
67.70 |
26,880.00 |
3,600.00 |
30,480.00 |
| TYC |
40'GP |
12,032.00 |
2,350.00 |
2,390.00 |
2,343.00 |
2,280.00 |
67.60 |
26,710.00 |
3,770.00 |
30,480.00 |
| KSCF |
40'HC |
12,034.00 |
2,352.00 |
2,698.00 |
2,340.00 |
2,585.00 |
76.40 |
26,590.00 |
3,890.00 |
30,480.00 |
| NTCIMC |
40'HC |
12,032.00 |
2,352.00 |
2,698.00 |
2,340.00 |
2,585.00 |
76.20 |
26,700.00 |
3,780.00 |
30,480.00 |
| SFEC |
40'HC |
12,031.00 |
2,352.00 |
2,698.00 |
2,340.00 |
2,585.00 |
76.30 |
26,650.00 |
3,830.00 |
30,480.00 |
| SHHD |
40'HC |
12,032.00 |
2,350.00 |
2,697.00 |
2,338.00 |
2,585.00 |
76.30 |
26,560.00 |
3,920.00 |
30,480.00 |
| SPIC |
40'HC |
12,031.00 |
2,352.00 |
2,700.00 |
2,340.00 |
2,585.00 |
76.40 |
26,590.00 |
3,890.00 |
30,480.00 |
| SZ(XH)CIMC |
40'HC |
12,032.00 |
2,352.00 |
2,695.00 |
2,698.00 |
2,585.00 |
76.40 |
26,700.00 |
3,780.00 |
30,480.00 |
| TYC |
40'HC |
12,032.00 |
2,350.00 |
2,348.00 |
2,695.00 |
2,598.00 |
76.20 |
26,580.00 |
3,900.00 |
30,480.00 |
| NTCIMC |
40'OT |
12,036.00 |
2,352.00 |
2,557.00 |
2,348.00 |
2,569.00 |
65.90 |
26,680.00 |
3,800.00 |
30,480.00 |
| SCRC-1 |
40'RH |
11,573.00 |
2,294.00 |
2,557.00 |
2,557.00 |
2,569.00 |
67.80 |
27,540.00 |
4,960.00 |
30,480.00 |
| SCRC-2 |
40'RH |
11,567.00 |
2,294.00 |
2,557.00 |
2,557.00 |
2,569.00 |
67.80 |
27,490.00 |
5,010.00 |
30,480.00 |
| SCRC-3 |
40'RH |
11,573.00 |
2,294.00 |
2,557.00 |
2,557.00 |
2,569.00 |
67.80 |
25,520.00 |
4,960.00 |
30,480.00 |
| SCRC-4 |
40'RH |
11,585.00 |
2,294.00 |
2,557.00 |
2,557.00 |
2,569.00 |
67.80 |
25,650.00 |
4,830.00 |
30,480.00 |
| REEFERCO |
40'RH |
11,572.00 |
2,286.00 |
2,556.00 |
2,346.50 |
2,511.50 |
67.70 |
28,800.00 |
5,120.00 |
34,000.00 |
| SCIC |
20'FR |
Length between end panels is 6,038mm, length between corner posts is 5,618mm, width over bottom side rail is 2,208mm, width between corner posts is 2,230mm,height from side rail to top casting is 2,233mm, height after end fram folded is 370mm. |
27,730.00 |
2,750.00 |
30,480.00 |
| SCIC |
40'FR |
Length between end panels is 12,180mm, length between corner posts is 11,176mm, width over bottom side rail is 2,380mm, width between corner posts is 2,230mm,height from side rail to top casting is 1,955mm, height after end fram folded is 647mm. |
40,000.00 |
5,000.00 |
45,000.00 |
| REMARK: |
20'OT/40'OT LENGTH BETWEEN TOP HEADERS: 5,689MM/11,798MM |
|
| |
20'OT/40'OT LENGTH BETWEEN TROUGH: 5,407MM/11,512MM |
|
| |
20'OT/40'OT WIDTH BETWEEN TOP SIDE RAIL: 2,252MM/2,232MM |
|
| |
20'OT/40'OT WIDTH BETWEEN STUBS WHEN HEADER REMOVED: 1,940MM/1,940MM |
|
| **** |
IN CONSIDERED OF THE RATED RANGE OF PORT MACHINE, PLS ENSURE CONTAINER CAN'T BE OVERLOADED.*** |
|